Сonstruction to control dimensions
Purpose of the construction object:.
The purpose of the construction: construction to control dimensions, has to built station on the way Aiyrtau - Ulan junction are designed to identify rolling stock and cargo that has gone out of gauge along the way, and should be triggered when the train passes, if the undercarriage equipment protrudes beyond the lower gauge of the rolling stock, as a result of its mechanical interaction with the track device of the construction located in front of the bridge 147 km PK 3 across the highway avenue them. K. Satpayev of the city of Ust-Kamenogorsk (on the stretch, the Ulan junction - station Novo-Ust-Kamenogorsk) in order to prevent damage to the bridge.