Based on paragraph 149 of Chapter 3 of the "Rules of technical operation, maintenance and repair of railway crossings" dated March 25, 2011 No. 168, approved by the Order of the Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated
10.07.2019 No. 495, a survey of the technical condition of all crossings and overpasses on which the movement of vehicles is carried out was conducted from April 1 to June 15, 2023 located on the Shar-Novoustkamenogorsk railway section and located on the territories of Ulansky and Zharminsky districts. The joint survey was attended by the founders of the East Kazakhstan branch of the Dosjan temir joly Joint Stock Company, a contracting organization, as well as representatives of the state institution "Management of Passenger Transport and Highways of the East Kazakhstan region", representatives of local government bodies, as well as the traffic police. During the inspection of crossings and overpasses, malfunctions threatening the safety of trains and vehicles were not revealed.